Routing
Routing connects all placed cells and macros using metal layers while adhering to design rules and minimizing congestion. It includes global and detailed routing, RC extraction, post-route resizing for timing closure, and design rule checking to catch violations. This stage finalizes the signal paths, ensuring clean connectivity and timing integrity ahead of signoff.
Routing Directory
.
├── inputs
│ ├── design_name.def -> /home/seema/axi2axil/run/cts/outputs/design_name.def
│ ├── design_name.odb -> /home/seema/axi2axil/run/cts/outputs/design_name.odb
│ ├── design_config.tcl -> /home/seema/axi2axil/inputs/design_config.tcl
│ ├── netlist.sdc -> /home/seema/axi2axil/run/synthesis/outputs/netlist.sdc
│ ├── rcx_rules -> /edacloud/projects/catalyzer_seema//scripts/openroad/rcx/Nangate45.rcx_rules
│ └── tech_config.tcl -> /home/seema/axi2axil/inputs/tech_config.tcl
├── logs
│ └── routing.log
├── outputs
│ ├── design_name.abstract.lef
│ ├── design_name.def
│ ├── design_name.lef
│ ├── design_name.nl.v
│ ├── design_name.odb
│ ├── design_name.pnl.v
│ ├── design_name.sdc
│ ├── design_name.spef
│ ├── design_name_1.lef
│ ├── grt.odb
│ ├── grt.sdc
│ ├── route.guide
│ ├── route.odb
│ └── routing.png
├── reports
│ ├── design_name_all.png
│ ├── design_name_clocks.png
│ ├── design_name_congestion.png
│ ├── design_name_placement.png
│ ├── design_name_resizer.png
│ ├── design_name_routing.png
│ ├── cell_usage.rpt
│ ├── checks.rpt
│ ├── cts_core_clock.png
│ ├── cts_core_clock_layout.png
│ ├── design_area.rpt
│ ├── dont_use.rpt
│ ├── drt_antennas.rpt
│ ├── initial_preroute_max_timing.rpt
│ ├── initial_preroute_min_timing.rpt
│ ├── initial_preroute_power.rpt
│ ├── initial_preroute_timing.rpt
│ ├── initial_preroute_unconstraints.rpt
│ ├── logic_depth_histogram.rpt
│ ├── long_wires.rpt
│ ├── max_timing.rpt
│ ├── min_timing.rpt
│ ├── post_global_route_max_timing.rpt
│ ├── post_global_route_min_timing.rpt
│ ├── post_global_route_power.rpt
│ ├── post_global_route_timing.rpt
│ ├── post_global_route_unconstraints.rpt
│ ├── power.rpt
│ ├── pre_detail_route_max_timing.rpt
│ ├── pre_detail_route_min_timing.rpt
│ ├── pre_detail_route_power.rpt
│ ├── pre_detail_route_timing.rpt
│ ├── pre_detail_route_unconstraints.rpt
│ ├── pre_global_route_max_timing.rpt
│ ├── pre_global_route_min_timing.rpt
│ ├── pre_global_route_power.rpt
│ ├── pre_global_route_timing.rpt
│ ├── pre_global_route_unconstraints.rpt
│ ├── route_drc.rpt
│ ├── stats.json
│ ├── timing.rpt
│ ├── unconstraints.rpt
│ └── updated_clks.sdc
├── scripts
│ ├── flow_routing.tcl
│ ├── generate_snpshot.rb
│ ├── save_images.tcl
│ ├── utiles.tcl
│ └── write_ref_sdc.tcl
└── tmp
Routing Directory File Descriptions
| Path | File | Description |
|---|---|---|
| inputs | <design_name>.def | Input DEF file from CTS stage used for routing. |
| <design_name>.odb | Input OpenDB database from CTS stage. | |
| design_config.tcl | TCL file specifying design-specific configuration parameters. | |
| netlist.sdc | Timing constraints from synthesis used for routing. | |
| rcx_rules | Extraction rule file defining RC parameters for parasitic extraction. | |
| tech_config.tcl | Technology configuration file defining PDK and libraries. | |
| logs | routing.log | Log file capturing routing stage execution details. |
| outputs | <design_name>.abstract.lef | Abstract LEF representing macro-level physical information. |
| <design_name>.def | DEF file after routing stage. | |
| <design_name>.lef | LEF file describing physical library and layout information. | |
| <design_name>.nl.v | Netlist after routing stage. | |
| <design_name>.odb | OpenDB database after routing stage. | |
| <design_name>.pnl.v | Physically optimized netlist after routing. | |
| <design_name>.sdc | Updated timing constraints after routing. | |
| <design_name>.spef | SPEF file containing extracted parasitic information. | |
| <design_name>_1.lef | Additional LEF variant generated during routing flow. | |
| grt.odb | OpenDB database after global routing. | |
| grt.sdc | Timing constraints used during global routing. | |
| route.guide | Routing guide file defining preferred routing paths. | |
| route.odb | OpenDB database after detailed routing. | |
| routing.png | Visualization of routed design layout. | |
| reports | <design_name>_all.png | Overall visualization of design stages and layout. |
| <design_name>_clocks.png | Visualization of clock network in the design. | |
| <design_name>_congestion.png | Congestion heatmap of routing resources. | |
| <design_name>_placement.png | Visualization of placement stage. | |
| <design_name>_resizer.png | Visualization of design after resizing optimizations. | |
| <design_name>_routing.png | Visualization of routing stage. | |
| cell_usage.rpt | Report showing standard cell utilization. | |
| checks.rpt | Summary of design rule and timing checks. | |
| cts_core_clock.png | Visualization of clock tree structure. | |
| cts_core_clock_layout.png | Layout view of clock tree placement. | |
| design_area.rpt | Report of design area and utilization. | |
| dont_use.rpt | List of restricted cells during implementation. | |
| drt_antennas.rpt | Report identifying antenna violations during routing. | |
| initial_preroute_max_timing.rpt | Setup timing report before routing. | |
| initial_preroute_min_timing.rpt | Hold timing report before routing. | |
| initial_preroute_power.rpt | Power report before routing. | |
| initial_preroute_timing.rpt | Combined timing report before routing. | |
| initial_preroute_unconstraints.rpt | Unconstrained paths report before routing. | |
| logic_depth_histogram.rpt | Histogram showing logic depth distribution. | |
| long_wires.rpt | Report identifying long interconnect wires. | |
| max_timing.rpt | Setup timing analysis report after routing. | |
| min_timing.rpt | Hold timing analysis report after routing. | |
| post_global_route_max_timing.rpt | Setup timing report after global routing. | |
| post_global_route_min_timing.rpt | Hold timing report after global routing. | |
| post_global_route_power.rpt | Power report after global routing. | |
| post_global_route_timing.rpt | Timing report after global routing. | |
| post_global_route_unconstraints.rpt | Unconstrained paths report after global routing. | |
| power.rpt | Final power analysis report. | |
| pre_detail_route_max_timing.rpt | Setup timing report before detailed routing. | |
| pre_detail_route_min_timing.rpt | Hold timing report before detailed routing. | |
| pre_detail_route_power.rpt | Power report before detailed routing. | |
| pre_detail_route_timing.rpt | Timing report before detailed routing. | |
| pre_detail_route_unconstraints.rpt | Unconstrained paths report before detailed routing. | |
| pre_global_route_max_timing.rpt | Setup timing report before global routing. | |
| pre_global_route_min_timing.rpt | Hold timing report before global routing. | |
| pre_global_route_power.rpt | Power report before global routing. | |
| pre_global_route_timing.rpt | Timing report before global routing. | |
| pre_global_route_unconstraints.rpt | Unconstrained paths report before global routing. | |
| route_drc.rpt | Report of design rule check (DRC) violations after routing. | |
| stats.json | JSON file containing metrics for dashboard visualization. | |
| timing.rpt | Consolidated timing analysis report. | |
| unconstraints.rpt | Report identifying unconstrained timing paths. | |
| updated_clks.sdc | Updated clock constraints after routing stage. | |
| scripts | flow_routing.tcl | TCL script defining the routing flow and configuration. |
| generate_snpshot.rb | Script for generating design snapshot images. | |
| save_images.tcl | TCL script for saving visualization outputs. | |
| utiles.tcl | Utility TCL script with helper procedures for routing flow. | |
| write_ref_sdc.tcl | TCL script to generate reference timing constraints. | |
| tmp | — |